Tìm kiếm Blog này

12.8.10

Linden Comansa - Leader of Flat-Top Tower Crane in the World

Linden Comansa is located in Pamplona, Spain which is well know in the world by bull running. She is the Flat-Top tower crane original creator and leader, possess of the leading manufacturing and management level.

Linden Comansa covers her business over five continents, more than 40 countries. As a continually developing global manufacturer, she is endeavouring her best for the customers.

Hangzhou Comansa JIE Construction Machinery Co., Ltd. ( COMANSA JIE) is established by JIE Holding Group (China) and Linden Comansa (Spain), which is the third largest tower crane manufacturer in the world. Comansa JIE is the first Sino-foreign joint venture and a large scale high-tech enterprise, professionally engaged in research, production, marketing and service of Flat-Top tower crane. It’s adjacent to Hangzhou Xisoshan International Airport and located in the south bank of Quiantang River, which is famous for Quianjang Tide.

The company was founded on October 16th 2006, with registered capital RMB202 million, hosting land area 80Mu, duilding square 15000 square meters. After the second stage of expansion, it will add another 70Mu land and new plant building area of 25000 square meters. The company introduced the original and leading technology of Flat-Top tower crane from Linden Comansa (Spain), developed sucessfully the CJ2100 and CJ1000 series of Flat-Top tower crane. All parts and global interchangeable with that of Linden Comansa (Spain) tower cranes. CJ serires tower cranes have passed the BV authentication and conformed to the requirements of CE authentication and the export inspection. They are used world wide in all kinds of construction projects, such as civil architecture, stell structure, road & bridge and power station.

Due to the internationalization orientation, Comansa JIE adheres to te concept of high starting point & high quality, and provides high reliability and high safety products and services to the medium and high end user. Going with technical transference, management intergration, and process re-engineering, COMANSA JIE is commited to building the Asia-Pacific center of Flat-Top tower crane for R&D, production, marketing and service, with the annual production of 500 units output value 1 billion.

More than 15,000 cranes had been sold to the whole market since the beginning; USA and Canada, Mexico, Chile, Argentina, Panama, European most important markets (Spain, Italy, France, Germany, Rumania, UK, Ireland, Russia, Ukraine, Poland, Sweden, Norway,.), Asian countries (China, Korea, Singapore, Thailand, VIetnam...),..

Since 2009, Comansa has appoint Chi Thang CET Co are distributor at Vietnam and Indochine area. Chi Thang CET was be constructor in specialize construction work as pylon of cable-stay bridge, dam of hydro-power plant, high-rise building,..

7.1.10

Hệ thống giàn giáo tự leo của Doka



Phần xây thô của tòa tháp Burj Dubai đã trở thành kết cấu cao nhất thế giới khi việc đổ bê tông tại chỗ toàn bộ cấu trúc lõi của công trình với độ cao 601 m tính từ mặt trên của bản móng đã kết thúc thành công. Ông Josef Kurzmann – Tổng Giám đốc Tập đoàn Doka đã chúc mừng ban giám đốc công trường của liên doanh nhà thầu Besix-Arabtech ngay khi hoàn thành phần lõi của tòa tháp đúng với tiến độ ban đầu đề ra, và cảm ơn họ vì sự hợp tác tuyệt vời trong công việc tại đây.

Việc xây dựng tòa tháp Burj Dubai đòi hỏi quy mô lớn khác thường về hoạt động đúc tường lõi cho một tòa nhà chọc trời. Tính ổn định của nó đòi hỏi toàn bộ 430.000m2 diện tích tường phải được thiết kế có cấu trúc rỗ tổ ong, với rất nhiểu khoảng rỗng giống như kết cấu khung máy bay. Điều đó có nghĩa là diện tích bề mặt các bức tường cũng như sàn đều tăng gấp đôi. Hệ thống giàn giáo tự leo của Doka hoạt động chính xác như một chiếc đồng hồ để tạo nên kết cấu lõi của công trình, cho phép cứ ba ngày lại hoàn thành một tầng.

Trong lịch sử công nghệ giàn giáo ván khuôn từ trước tới nay chưa từng có một lượng giàn giáo tự leo lớn được triển khai, kéo dài trong suốt thời gian thi công và lên tới một độ cao như vậy trong điều kiện thi công cực kỳ khó khăn. Việc hoàn thành thắng lợi tiến trình thi công kết cấu lõi của tòa tháp bằng bê tông đổ tại chỗ này không chỉ mang lại cho Doka một kỷ lục thế giới mà còn mang lại rất nhiều kinh nghiệm quý báu từ điều kiện thi công rất khó khăn ở đây.

Thiết kế kiến trúc của công trình cũng tạo nên những yêu cầu khó khăn đặc biệt đối với hệ thống giàn giáo, ván khuôn. Kết cấu lõi của tòa tháp Burj Dubai có mặt cắt ba cánh hình chữ Y và thu nhỏ dần khi lên cao với không ít hơn 32 lần thay đổi kích thước. Hệ thống giàn giáo Doka cho phép điều chỉnh theo từng thay đổi này. Những vị trí tiếp giáp của hệ thống sàn công tác cho phép chỉnh lý hệ thống giàn giáo một cách rất an toàn và tin cậy trong mọi lần điều chỉnh mà chỉ ảnh hưởng rất ít tới thời gian của chu trình quay vòng ván khuôn.

Nhằm đáp ứng chu trình quay vòng ván khuôn 3 ngày, hệ thống giàn giáo ván khuôn này được thiết kế nhằm đơn giản hoạt động nhưng hiệu quả cao. Tính bền vẫn được đặt lên hàng đầu cho dù ‘cỗ máy’ này đã hoạt động tốt trong nhiều năm rồi. Độ bền khỏe của các cấu kiện giàn giáo ván khuôn Doka đã làm ngạc nhiên đến cả các chuyên gia, và trung bình chỉ phải thay tấm bề mặt ván khuôn một lần trong suốt quá trình đổ 180 đoạn bê tông tạo nên công trình.

Ông Kyung-Jun Kim, Giám đốc Dự án của Samsung nói: “Do kết cấu lõi bằng bê tông đổ tại chỗ được thi công trước các mặt sàn nên tiến độ xây dựng toàn bộ công trình phụ thuộc vào giải pháp giàn giáo tự leo của Doka”, ông nói tiếp: “Hệ thống giàn giáo tự leo của Doka hoạt động chính xác như một cỗ máy, cho phép chúng tôi hoàn thành kết cấu lõi đúng tiến độ đề ra ban đầu”.

Màn chắn bảo vệ

Tại dự án nổi tiếng này, không gian làm việc an toàn cũng được quan tâm nhiều hơn, đặc biệt là trong hoạt động đổ bê tông sàn cho các tầng tiếp nối theo phần lõi công trình. Để bảo vệ công nhân đang hoạt động tại đây, Doka đã cung cấp cho dự án hệ thống màn chắn bảo vệ tự leo Xclimb. Hệ thống màn chắn bảo vệ này bao kín hoàn toàn cả hai sàn đang thi công cùng ba tầng phía dưới nó, biến mỗi khoảng không giữa hai tầng thành một không gian kín.

Ông Mohamed Moizuddin, phụ trách sức khỏe và an toàn của dự án nói: “nhờ đó mà trong suốt thời gian hai năm rưỡi thi công, đã không có một tai nạn nào xảy ra”.

Do sơ đồ mặt bằng của tòa tháp Burj Dubai được thiết kế giống như một bông hoa sa mạc, chúng có nhiều hơn gấp hai lần số góc cạnh so với một tòa nhà chọc trời thông thường. Tất cả sẽ được bảo vệ an toàn tuyệt đối. Nếu không có hệ thống màn chắn bảo vệ của Doka, rủi ro cho công nhân làm công việc đổ bê tông sàn sẽ rất lớn. Điều kiện thời tiết ở đây cũng rất khắc nghiệt, khí hậu sa mạc ập đến ngay sau khí hậu đại dương dẫn đến sự thay đổi nhiệt độ thất thường giữa ngày và đêm. Kiểu thời tiết này thường dẫn tới những trận bão cát dữ dội với vận tốc gió lên tới 100km/giờ. Điều kiện thời tiết như vậy đã thử thách cả con người và vật liệu đến tận mức giới hạn. Tuy nhiên hệ thống giàn giáo tự leo Doka đã được thiết kế để đương đầu với tốc độ gió lên tới 200km/giờ.

Ông Josef Kurzmann, Tổng Giám đốc của Doka nói tóm lại như sau: “Với dự án này, Doka đã chứng minh rằng nếu bạn ứng dụng đúng giải pháp về giàn giáo, ván khuôn, bạn có thể giải quyết thành công mọi thử thách dù to lớn hay khó khăn đến mấy. Bí quyết của chúng tôi, và những kinh nghiệm có được từ dự án Burj Dubai, đã khiến chúng tôi trở thành đối tác về giàn giáo, ván khuôn lý tưởng cho hầu hết các dự án hùng vĩ trên khắp hành tinh”.

24.6.09

First use of Doka's Table Lifting System in U.S.


The first U.S. use of Doka's Table Lifting System (TLS) in conjunction with pre-assembled Dokamatic tables has proven to save time and labour on two high-profile projects: the River House Condominiums in Grand Rapids, Mich. and the Renaissance Hotel in Raleigh, N.C.

Construction of the River House Condominiums, a 36-storey horizontal and vertical post-tensioned concrete structure began in 2006. Upon completion, this structure will be the second tallest building in the state and will provide additional residences for people who want to live in the downtown area. Concrete contractor Kent Companies of Grand Rapids is constructing the concrete frame for River House. During their visit to World of Concrete 2007, they quickly recognized how the Dokamatic tableforms and the TLS system were ideal for this project.
Dokamatic, the fast pre-assem¬bled slab formwork system, can be moved by just one field work¬er with the aid of a powered drive unit and shifting trolley. The sys¬tem has now been enhanced with the development of the Doka Ta¬ble Lifting System (TLS). The TLS is an electric powered lifting plat¬form that allows Dokamatic table-forms to be cycled between floors without the need for a crane. The system is adaptable to any build¬ing structure and can be used from the ground floor up. It at¬taches to the previously cast slab with embedded anchors, and can¬tilevers from the building as a mechanical outrigger platform.
For non-typical floors 1 through 5, concrete contractor Kent Com¬panies utilized the versatile Dokaflex system. Dokamatic Ta¬bles were then introduced with the start of typical Level 6 and the Doka Table Lifting System on Level 7. More than 30,000 square feet of tables have been supplied and all tables and loose Dokaflex formwork is being cycled from floor to floor, independently of the crane, with the TLS.
"Without the TLS, we would not be as far along on the project as we are," said Paul Bowne, Kent Companies Project Manager.

The TLS also proved benefi¬cial for the Renaissance Hotel, a new 10-storey hotel structure with a post-tensioned slab built over two levels of parking un¬der construction at North Hills, a new three-city block mixed-use district in Raleigh, N.C. Con¬crete contractor United Forming Inc. began using the TLS on lev¬el four in August and will top out the 229-room four-star luxury ho¬tel in January 2008. By installing the Table Lifting System to the structure in order to move the ta¬bles from floor to floor, the crane was free to move the shear wall formwork and rebar as* well as unload trucks for all contractors at the same time. Juvenal Ibarra, General Superintendent of United Forming, said, "I like the TLS for two reasons -- it takes less labour and no crane time to move the tables, and it is much safer than pulling them out with a crane."

All round safety at all heighs

The Borough of Croydon is visibly developing into one of South London's most up-and-coming residen­tial districts. Many new apartments are being built here, with one of the latest projects being the 25-storey residential development "Altitude 25". Set to be Croydon's tallest building and a defining urban landmark, this 82 m elliptical tower will comprise 235 residential units when completed. Contractors Foundation Developments Ltd. are using the new Xclimb 60 protection-screen system to ensure the safety of the slab-forming operations.
Twenty protection-screen units enclose the top four floors at a time, so as to safeguard all the slab-forming operations on the structure shell. This room-high en­closure provides complete pro­tection around the accident-prone edges of the floor-slabs where edge falsework and column form­ing operations have to be carried out. Made of trapezoidal sheet, the protection-screen system not only protects the site crew against falls, but also against inclement weather. In a safe, "feel-good" working en­vironment like this, it's no surprise that the forming operations move ahead much better. To facilitate shifting the floor-slab formwork up to the next floor, the protection screen comes with three integral loading platforms. From these, the formwork equipment is lifted by crane to the next forming level.Xclimb 60 can either be lifted and reset by crane, or by handy porta­ble hydraulic units. Either way, the vertical profiles of the protection screen are guided up the side of the structure in positioning shoes, permitting safe, fast and efficient weather-independent repositioning operations even when wind-speeds of up to 72 km/h (45 mph) are ex­perienced. As the site crane was al­ready working to capacity, it was decided in London to go for the hy­draulic option. One hydraulic unit and four hydraulic cylinders are all that is needed to raise two protec­tion-screen units at the same time. In this way, the 83-m-circumference enclosure on the Altitude 25 project is climbed one storey upwards in just one day. During this climb­ing operation, the formwork to the in-situ concrete slabs can stay in place, which greatly speeds up the construction workflow. FDL-Project Manager Matt Callaghan puts it like this: "The Xclimb system gives our people the ideal protection while they're working on the floors un­der construction. The hydraulic lift­ing operation means that the crane stays free, so in the meantime the team can get on with the job of pouring the columns at the slab-edges, using concrete skips." .

19.6.09

Alimak lifts off at Vietnam power station

An Alimak lift has been installed to provide access to monitoring equipment, inside the 200 m high chimney of the recently completed Uong Bi no. 1 extension power station in Vietnam.
The enlarged thermal power plant, located in northern Quang Ninh province, has begun supplying electricity for Vietnam's national grid following a three-year construction period. The power plant was the first of its kind to be designed, built, installed and commissioned by Machinery Installation Corporation (Lilama), a Vietnamese Corporation.
The initial order for the Alimak lift was placed by the Italian subcontractor for the chimney construction, Chimneys and Refractories International S.r.l (CRint). Following its successful installation and commissioning, the company is bidding for the second chimney contract on Uong Bi no. 2, which will be started later this year.
Designed to operate in demanding industrial environments, the installed Alimak SE 400 features a lifting height of I 185.4 m and equipped with the company's I rack and pinion drive system.
The Alimak rack and pinion drive system does not need an expensive machine room as the lift carries its own machinery and no load bearing lift shaft is required. In I a power outage, the lift car can slide back to I the nearest landing by gravity at controlled j speed using the centrifugal brake. If the I rated speed exceeds, the car is stopped I automatically by a safety device.
The Alimak SE ranges is available with ( capacities of between 300 and 2,400 kg, and features 30 different sized standard cars up to a maximum 1.56 m by 3 m. Travelling speeds are up to 1.0 m/sec and lifting heights can he up to 250 m with standard accessories.
The US$300 million Uong Bi no.l expansion has a capacity of 300 mW and is expected to generate an annual output ol / 286 billion kWh.

11.4.09

CHI THANG CET CO LTD

Công ty TNHH Xây dựng Thương mại & Dịch vụ kỹ thuật Chí Thắng là doanh nghiệp được thành lập tháng 1 năm 2003 hoạt động trong lĩnh thi công các công trình xây dựng và cung cấp các thiết bị phục vụ thi công như hệ thống cốp pha DOKA (Cộng hoà Áo), vận thăng lồng Alimak (Thuỵ Điển), Cẩu tháp Comansa (Tây Ban Nha).

Trong hơn 6 năm hoạt động, Công ty chúng tôi đã tham gia thi công các dự án lớn như :

  • Dự án Cầu Bính - Hải Phòng năm 2003.
  • Dự án Cầu Bãi Cháy - Quảng Ninh năm 2005.
  • Dự án Cầu Cần Thơ - Cần Thơ năm 2006 ( nhà thầu thi công xây dựng trụ tháp).
  • Cung cấp ván khuôn và thi công 4 vách tường chính cao nhất cho Dự án Trung tâm Hội nghị Quốc gia - Hà Nội năm 2005.
  • Cung cấp cốp pha leo Doka cho một số dự án nhà cao tầng tại Việt Nam.
  • Dự án Đập vòm của thuỷ điện Nậm Chiến tại Sơn La.


Với đội ngũ nhân viên và chuyên gia nước ngoài của Công ty có trình độ chuyên môn cao, giàu kinh nghiệm, năng động, sáng tạo và nhiệt tình cùng với hệ thống trang thiết bị hiện đại luôn đáp ứng được yêu cầu về chất lượng và tiến độ của các dự án.
Kính mời quý vị tham khảo một số hình ảnh về hệ thống cốp pha Doka hiện nay đang được ứng dụng tại Việt Nam.
Với năng lực của mình, Công ty Chí Thắng tự tin và sẵn sàng hợp tác với Quý công ty.